POPPUR爱换

 找回密码
 注册

QQ登录

只需一步,快速开始

手机号码,快捷登录

搜索
查看: 3500|回复: 12
打印 上一主题 下一主题

HD7900完全不是对手..Nvidia GPU roadmap slips a year too

[复制链接]
跳转到指定楼层
1#
发表于 2011-12-31 09:05 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
难怪NV这么蛋定

http://semiaccurate.com/2011/12/30/nvidia-gpu-roadmap-slips-a-year-too/



It looks like Nvidia has slipped their GPU roadmap a year, but that is news to no one. The biggest shock of them all is that the company actually admitted it slipped, even if it is two years after the fact.
The short story is that Nvidia has once again admitted what SemiAccurate has been saying for literally years, their GPU roadmap had no chance of being released on the schedule they were promising. Without getting in to the gory details, the story is exactly as we have been telling our consulting clients, the Fermi debacle has waterfall effects on the entire roadmap, and that is finally starting to show up in official documents.
If you recall, Nvidia doesn’t give out long term roadmaps until they are way behind, and want to ‘prove’ that they are not. Until the Fermi debacle, there was never any comment on future roadmaps, but to ‘prove’ that all was well, the company started tossing them out like candy at a parade. The problem now is when those roadmaps can’t be met because they were never realistic, they become just stock price adjustment tools for the unwary analyst.
When the silicon doesn’t match the roadmap, the silicon is renamed, and the roadmap stays intact. The most recent example of this is Tegra 4, a chip that was code named T40. T40 had zero chance of coming out on time due to executive meddling, micromanagement, and engineering through whim, so Tegra 3.5 was inserted. T40 is now Tegra 5, T50 is now Tegra 6, and T35 was always meant to be there. Executive face saved, roadmap intact, nothing to see here, move along folks. The silicon for the roadmaps is completely different, but the slides are reusable.

The way things were for too long
That brings us to the latest slip, the GPUs. Remember that Fermi was promised to rooms full of analysts for 2009, and Jen-Hsun himself waved faked cards around to ‘prove’ it. Until a few weeks ago, the GPU roadmap shown off by the company was still insisting that the GPU came out in 2009, even though it was not released until Q2/2010. That curious situation didn’t change the fact that the roadmaps still claimed otherwise for all of 2010 and most of 2011.
Those same roadmaps claimed that Kepler will be a 2011 part, even though the company directly said that it will not be. Luckily at GTC Asia in mid-December, Nvidia corrected that slide, two years late, to say the same thing we have been telling the financial community for two plus years. It now seems that Fermi was actually 2010, Kepler will not be 2011, and Maxwell went from 2013 to 2014. Who knew? SemiAccurate’s clients for one, but no one at Nvidia management seems to have been let in on the joke.

The way things are, and always were, just ask
The short version is that their roadmap slipped a year. Kepler is 2012, and Project Denver/T50 which is based on Maxwell, is not, and never had a chance to be a late 2012 product, much less early 2013. Then again, it was never meant to be, unless you were an analyst talking privately to the company, they got different timelines for some reason. Since Denver is based on a core that has now officially slipped from 2013 to 2014, well, you can do that math yourself.
In the end, it is refreshing to see Nvidia finally admitting that there is a slip, even if it is in a backhanded and circuitous route. Their roadmaps slipped a year, but that isn’t a change as much as a semi-public admission of the no longer deniable truth. I suppose congratulations are in order for this milestone, lets hope the personal growth in Santa Clara continues.S|A
2#
发表于 2011-12-31 09:11 | 只看该作者
看不懂 求翻译
回复 支持 反对

使用道具 举报

3#
发表于 2011-12-31 09:49 | 只看该作者
这个图都转来转去转了100年了

到现在老黄连高达都拿不出来
回复 支持 反对

使用道具 举报

4#
发表于 2011-12-31 09:54 | 只看该作者
看到亮点了,第一张图2011年kepler,第二张图2012年kepler
回复 支持 反对

使用道具 举报

5#
发表于 2011-12-31 13:26 | 只看该作者
看上去是力挺NV,实际上是黑NV的啊? 2011开普勒
回复 支持 反对

使用道具 举报

头像被屏蔽
6#
发表于 2011-12-31 14:14 | 只看该作者
提示: 作者被禁止或删除 内容自动屏蔽
回复 支持 反对

使用道具 举报

Cherbim 该用户已被删除
7#
发表于 2011-12-31 15:30 | 只看该作者
提示: 作者被禁止或删除 内容自动屏蔽
回复 支持 反对

使用道具 举报

8#
发表于 2011-12-31 18:28 | 只看该作者
应该是指通用计算方面

游戏能提升50%不错了。
回复 支持 反对

使用道具 举报

9#
发表于 2011-12-31 19:00 | 只看该作者
2011年最后一天,高达2代在哪呢?
回复 支持 反对

使用道具 举报

10#
发表于 2011-12-31 19:11 | 只看该作者
043265 发表于 2011-12-31 09:11
看不懂 求翻译

Jiushi 就是开普勒  和  麦克斯维尔 都退后了一年
回复 支持 反对

使用道具 举报

11#
发表于 2011-12-31 21:01 来自手机 | 只看该作者
又见反讽…
回复 支持 反对

使用道具 举报

12#
发表于 2011-12-31 23:10 | 只看该作者
本帖最后由 vista@xp 于 2011-12-31 23:12 编辑
flyingfeifei 发表于 2011-12-31 21:01
又见反讽…


NV支持者说,AMD不给力,老黄慢跑一年还没跟上?
回复 支持 反对

使用道具 举报

马由 该用户已被删除
13#
发表于 2011-12-31 23:27 | 只看该作者
提示: 作者被禁止或删除 内容自动屏蔽
回复 支持 反对

使用道具 举报

您需要登录后才可以回帖 登录 | 注册

本版积分规则

广告投放或合作|网站地图|处罚通告|

GMT+8, 2025-2-7 06:21

Powered by Discuz! X3.4

© 2001-2017 POPPUR.

快速回复 返回顶部 返回列表